Engineers at the County Sanitation Districts of Los Angeles County used ALGOR's PipePak to evaluate loads at the support locations of this odor control piping system, which is part of the Joint Water Pollution Control Plant in Carson, California. |
|
56K - Dial-up modem100K - ISDN or faster250K - Cable, DSL or T1 |